Sample Sidebar Module

This is a sample module published to the sidebar_top position, using the -sidebar module class suffix. There is also a sidebar_bottom position below the menu.

Sample Sidebar Module

This is a sample module published to the sidebar_bottom position, using the -sidebar module class suffix. There is also a sidebar_top position below the search.
Home

We have the PROVEN INDUSTRY EXPERIENCE to make your project a success

PSE Pty Ltd | ABN 341 378 486 07

Tel 07 3279 6091 | PO Box 3595, Mt Ommaney Qld 4074

Home | About Us | Our Services | Featured Projects | Value Solutions | Green Solutions | Contact Us

Website by BizzDesign

Valley Metro Shopping Centre, Fortitude Valley

Renovation of inner city underground railway station
including retail, office and amenities
Completion date January 2020

 

Woolworths Parklands, Southport

Fitout of 3000msq Woolworths Supermarket
Completion date January 2019

 

Officeworks Morayfield

Fit out of 1116msq retail/office Officeworks store
Completion date Early 2018

 

Woolworths Ascot

Shopping center and 3200msq Woolworths supermarket,
including retail, office and car park facility
Completion date September 2018

 

Kmart The Pines, Elanora

2000msq multi-level Kmart retail fit out
Completion date November 2017

 

The Greek Club Restaurant, West End

Multi story renovation of iconic West End club including
bar, events hall and new restaurants
Completion date May 2018

 

The Boundary Hotel, West End

Demolition and rebuild of multistory Iconic West End
Bar and restaurant complex including new specialty lighting
Completion date June 2019

 

Sonic Healthcare, Brisbane CBD

Tier 3 data center switchboard design of inner city healthcare
data center with a fully automated multilevel UPS/Generator
power redundancy system
Completion date January 2019

 

Oaklands Retirement Village, Beaudesert 

146 lot assisted living complex with central facilities building
Completion date October 2020

 

450 Newman Rd, Geebung

Extension of Everhard Industries production facility including
new administration building and factory
Completion date March 2020

 

33-35 Saltair St, Caloundra

34 unit Kings Beach beach front luxury high-rise Apartments
Completion Date Late 2019

 

528-530 Vulture St, East Brisbane

25 unit inner city residential townhouse and apartment complex
Expected completion date December 2021  

 

< Back to Featured Projects

12-14 Wharf St, Cleveland

36 unit 5 storey residential development
Completion date late 2016

 

Silver Springs Retirement Village

Wembley Rd, Browns Plains
90 bed retirement home and leisure block
Design complete, project on hold

 

25-29 Stanley St, Indooroopilly

26 unit residential development
Completion date early 2016 

 

Council Depot, Beerwah

Sunshine Coast Council industrial and offices
Completion date late 2016

 

Hear & Say College, Ashgrove

2 storey college & playgroup building
Completion date late 2014

 

Jurgens St Woolloongabba Development

5 storey commercial/residential mixed use building
Completion date June 2011

 

Camp Hill Hotel & Dan Murphy's

Retail bottle shop and tavern
Project on hold

 

Brunswick Hotel & BWS

Retail bottle shop and tavern
Completion date of late 2014

 

Moreton Bay Council, Burpengary Sports Park 

Multi use precinct, clubhouse and sports fieds
Completion date late 2017

 

Suncorp Stadium Level 1 Floodworks

Stadium level 1 following 2011 floods
Completion date January 2012

 

CSR Gyprock Distribution Hub

Warehouse and office complex
Completion date late 2015

 

3 Burnage St, Toowoomba

Ergon/NBN, 1 to 12 lot freehold subdivision
Completion date of late 2016   

 

Wynnum 1

Client: Electrical Contractor

 

Discipline: Education 

 

Completion: Late 2012

 

Project was a Greenfield school development in Wynnum, Qld. PSE was awarded the electrical design and construct contract. School consisted of sporting fields, classroom, administration buildings and an Olympic size swimming pool. A new council bus stop was also constructed at the front of the school

Green star electrical energy efficient has been incorporated to some buildings on site, with one being awarded 6 star rating of maximum energy efficiency and environment impact

 

 

 

wynnum

Electrical services made use of energy efficient LED lighting controlled by motion sensors and energy metering at every switchboard. Window lighting was connected to daylight sensors, working with ambient light to maintain sufficient light levels inside room, whilst saving energy. 

 

 

 

 

 

 

 

 

< Previous Project

> Next Project

TOLL QRX 2

Client: Builder

 

Discipline: Industrial

 

Completion: Late 2012

 

PSE was awarded electrical design and construct project working directly for the builder. Project comprised of upgrades to the ageing trucking facility resulting from its increased use servicing most of Brisbane and Ipswich.

Project involved extension of a new 12,000msq trucking awning for purposed of loading and unloading multiple trucks, office and staff facilities, 2-storey operation buildings, maintenance warehouse and gatehouse.

 

 

TOLL QRX 1

Due to the substantial roadway lighting required within the site, large 2kW 20M mast poles were used to sufficiently light site externals. As the awning was so large and mainly needed to be used at night, achieving energy efficiency was a challenge when it came to lighting.

Dimmable LED high bay lights were then used inside the awing, connected to a daylight sensor. This enabled the customer to make optimum used of ambient light and increase/decrease the artificial light levels automatically as required.

It is estimated a 50% saving in running costs with the use of automated lighting control. 

 

 

 

 

< Previous Project

> Next Project 

Wynnum 1

Client: Electrical Contractor

 

Discipline: Education 

 

Completion: Late 2012

 

Project was a Greenfield school development in Wynnum, Qld. PSE was awarded the electrical design and construct contract. School consisted of sporting fields, classroom, administration buildings and an Olympic size swimming pool. A new council bus stop was also constructed at the front of the school

Green star electrical energy efficient has been incorporated to some buildings on site, with one being awarded 6 star rating of maximum energy efficiency and environment impact

 

 

wynnum

Electrical services made use of energy efficient LED lighting controlled by motion sensors and energy metering at every switchboard. Window lighting was connected to daylight sensors, working with ambient light to maintain sufficient light levels inside room, whilst saving energy. 

 

 

 

 

 

 

 

 

< Previous Project

> Next Project

Our Business Hours

We are open during the following business hours:

Monday to Friday: 8am to 5pm
Saturday and Sunday: Closed
Phone: 07 3279 6091 

Contact Us