Client: Developer
Discipline: Multi Residential
Completion: Late 2019 (Currently in design)
Project involved a new multi stage residential water front development in Bribie Island Qld. Stage 1 comprised of 3 levels, 2 buildings, basement car park and 64 residential units level. PSE were commissioned for the electrical services design contract.
Development comprised of 3 separate stages. All electrical backbone for 3 stages has been allowed as part of stage 1, involving allowing future electrical and communications infrastructure, reticulation and load capacity forecasts as part of the works. Liaison is currently under way with Energex for installation of site supply.
NBN backbone is also required for future allowance for the site, which includes planning of NBN cupboard equipment spatial at each level of the building. This would enable high speed internet to all units throughout.
LED lighting was designed to all external and car park areas. With use of the latest technology lighting was able to be modelled in software package Dialux, showing a generated simulation of the light output. With the use of this technology, quantity of lights and unwanted glare was able to be decreased before installation, avoiding costly variations throughout the project and providing for uniform and efficient lighting solution.